Sorry, you need to enable JavaScript to visit this website.
Technical Abstract

4D pre-stack time migration: application to thermal EOR monitoring

Back to Technical Content
In 4D seismic, the velocity model used for imaging and reservoir characterization can change over calendar time as the reservoir is produced. This is particularly true for heavy-oil reservoir produced by steam simulation (EOR). We propose an automatic 4D update of the 3D velocity model using an efficient technique based on 4D pre-stack time migration (4D-PSTM) that describes the pre-stack differential kinematic effects by matching the 4D dataset. On real continuous 4D seismic data, the 4D-PSTM allows us to quantify interval velocity variations that can be used to map temperature changes in the reservoir in agreement with petro-elastic model expectations.
Download Resource

Publications

EAGE - European Association of Geoscientists and Engineers

Authors

Julien Cotton, Herve Chauris, Eric Forgues, Laurene Michou

Month

June

Copyright

© 2015 EAGE
Share Link
LinkedIn icon Facebook icon Twitter icon